DATE:19-05-2011                                                                 

Generation

                      12175 MW      

Load Management 

      5985 MW

Computed Demand

                      18160 MW

KESC Export (Maximum)

    700 MW

Generation Contribution:

 

(i)     Hydel

     4928 MW

(ii)    PEPCO Thermal

     1267 MW

(iii)   IPPs

     5904 MW

(iv)   Rental

       76 MW


DATE:16-05-2011

Generation

                      13460 MW      

Load Management 

      3330 MW

Computed Demand

                      16790 MW

KESC Export (Maximum)

    710 MW

Generation Contribution:

 

(i)     Hydel

     5086 MW

(ii)    PEPCO Thermal

     1549 MW

(iii)   IPPs

     6763 MW

(iv)   Rental

       62 MW


DATE:14-05-2011

Generation

                      13773 MW      

Load Management 

      1940 MW

Computed Demand

                      15713 MW

KESC Export (Maximum)

    600 MW

Generation Contribution:

 

(i)     Hydel

     5073 MW

(ii)    PEPCO Thermal

     1352 MW

(iii)   IPPs

     7180 MW

(iv)   Rental

       168 MW


DATE:13-05-2011

Generation

                      13787 MW      

Load Management 

      1988 MW

Computed Demand

                      15775 MW

KESC Export (Maximum)

    690 MW

Generation Contribution:

 

(i)     Hydel

     5002 MW

(ii)    PEPCO Thermal

     1349 MW

(iii)   IPPs

     7269 MW

(iv)   Rental

       167 MW


DATE:12-05-2011

Generation

                      13653 MW      

Load Management 

      2630 MW

Computed Demand

                      16283 MW

KESC Export (Maximum)

    750 MW

Generation Contribution:

 

(i)     Hydel

     4923 MW

(ii)    PEPCO Thermal

     1352 MW

(iii)   IPPs

     7216 MW

(iv)   Rental

       162 MW


 DATE:11-05-2011

Generation

                      13547 MW      

Load Management 

      2520 MW

Computed Demand

                      16067 MW

KESC Export (Maximum)

    710 MW

Generation Contribution:

 

(i)     Hydel

     5020 MW

(ii)    PEPCO Thermal

     1639 MW

(iii)   IPPs

     6826 MW

(iv)   Rental

        62 MW

DATE: 09-05-2011

Generation

                      12999 MW 

Load Management 

      2995 MW

Computed Demand

                      15994 MW

KESC Export (Maximum)

    730 MW

Generation Contribution:

 

(i)     Hydel

     4768 MW

(ii)    Thermal

     1791 MW

(iii)   IPPs

     6373 MW

(iv)   Rental

        67 MW

 

DATE:07-05-2011

Generation

                      12452 MW 

Load Management 

      2580 MW

Computed Demand

                      15032 MW

KESC Export (Maximum)

    720 MW

Generation Contribution:

 

(i)     Hydel

     4711 MW

(ii)    PEPCO Thermal

     1714 MW

(iii)   IPPs

     5959 MW

(iv)   Rental

        68 MW

 

DATE:06-05-2011

Generation

                      12411 MW      

Load Management 

      2730 MW

Computed Demand

                      15141 MW

KESC Export (Maximum)

    740 MW

Generation Contribution:

 

(i)     Hydel

     4341 MW

(ii)    PEPCO Thermal

     1540 MW

(iii)   IPPs

     6468 MW

(iv)   Rental

        62 MW

 

DATE:05-05-2011

Generation

                      12272 MW      

Load Management 

      5602 MW

Computed Demand

                      17874 MW

KESC Export (Maximum)

    750 MW

Generation Contribution:

 

(i)     Hydel

     4657 MW

(ii)    PEPCO Thermal

     1482 MW

(iii)   IPPs

     6071 MW

(iv)   Rental

        62 MW




DATE:04-05-2011

Generation

                      12272 MW      

Load Management 

      5244 MW

Computed Demand

                      16997 MW

KESC Export (Maximum)

    750 MW

Generation Contribution:

 

(i)     Hydel

     4657 MW

(ii)    PEPCO Thermal

     1482 MW

(iii)   IPPs

     6071 MW

(iv)   Rental

        62 MW


DATE:03-05-2011

Generation

                      11753 MW      

Load Management 

      5244 MW

Computed Demand

                      16997 MW

KESC Export (Maximum)

    760 MW

Generation Contribution:

 

(i)     Hydel

     4408 MW

(ii)    PEPCO Thermal

     1426 MW

(iii)   IPPs

     5857 MW

(iv)   Rental

        62 MW

 

DATE:02-05-2011

Generation

                      11080 MW      

Load Management 

      5890 MW

Computed Demand

                      16970 MW

KESC Export (Maximum)

    745 MW

Generation Contribution:

 

(i)     Hydel

     4247 MW

(ii)    PEPCO Thermal

     1183 MW

(iii)   IPPs

     5588 MW

(iv)   Rental

        62 MW



DATE:01-05-2011
 

Generation

                      11725 MW      

Load Management 

      4738 MW

Computed Demand

                      16463 MW

KESC Export (Maximum)

    810 MW

Generation Contribution:

 

(i)     Hydel

     4233 MW

(ii)    PEPCO Thermal

     1199 MW

(iii)   IPPs

     6209 MW

(iv)   Rental

        84 MW



DATE:
29-04-2011  

Generation

                      12259 MW      

Load Management 

      3881 MW

Computed Demand

                      16140 MW

KESC Export (Maximum)

    710 MW

Generation Contribution:

 

(i)     Hydel

     4181 MW

(ii)    PEPCO Thermal

     1806 MW

(iii)   IPPs

     6210 MW

(iv)   Rental

        62 MW

 

DATE:28-04-2011  

Generation

                      12229 MW      

Load Management 

      3891 MW

Computed Demand

                      16120 MW

KESC Export (Maximum)

    730 MW

Generation Contribution:

 

(i)     Hydel

     4005 MW

(ii)    PEPCO Thermal

     1745 MW

(iii)   IPPs

     6417 MW

(iv)   Rental

        62 MW

 

DATE:27-04-2011  

Generation

                      12269 MW      

Load Management 

      3821 MW

Computed Demand

                      16090 MW

KESC Export (Maximum)

    730 MW

Generation Contribution:

 

(i)     Hydel

     4068 MW

(ii)    PEPCO Thermal

     1818 MW

(iii)   IPPs

     6365 MW

(iv)   Rental

        18 MW



DATE:
26-04-2011

Generation

                      12054 MW      

Load Management 

      3995 MW

Computed Demand

                      16049 MW

KESC Export (Maximum)

    720 MW

Generation Contribution:

 

(i)     Hydel

     3931 MW

(ii)    PEPCO Thermal

     1825 MW

(iii)   IPPs

     6236 MW

(iv)   Rental

        62 MW

 

DATE:25-04-2011

Generation

                      11315 MW      

Load Management 

      4879 MW

Computed Demand

                      16194 MW

KESC Export (Maximum)

    730 MW

Generation Contribution:

 

(i)     Hydel share

     3834 MW

(ii)    WAPDA Thermal share

     1568 MW

(iii)   IPPs

     5851 MW

(iv)   Rental

        62 MW



DATE:24-04-2011

Generation

                      10125 MW      

Load Management 

      5878 MW

Computed Demand

                      16003 MW

KESC Export (Maximum)

    730 MW

Generation Contribution:

 

(i)     Hydel share

     3035 MW

(ii)    WAPDA Thermal share

     1466 MW

(iii)   IPPs

     5562 MW

(iv)   Rental

        62 MW

 

DATE:22-04-2011

Generation

                       9788 MW      

Load Management 

      5722 MW

Computed Demand

                      15510 MW

KESC Export (Maximum)

    660 MW

Generation Contribution:

 

(i)     Hydel share

     2486 MW

(ii)    WAPDA Thermal share

     1390 MW

(iii)   IPPs

     5670 MW

(iv)   Rental

        242 MW

 

DATE:21-04-2011

Generation

                       9465 MW      

Load Management 

        5010 MW

Computed Demand

                      14475 MW

KESC Export (Maximum)

    650 MW

Generation Contribution:

 

(i)     Hydel share

     2585 MW

(ii)    WAPDA Thermal share

     1396 MW

(iii)   IPPs

     5333 MW

(iv)   Rental

        151 MW

 

DATE:20-04-2011

Generation

                       9892 MW      

Load Management 

        4620 MW

Computed Demand

                      14512 MW

KESC Export (Maximum)

    710 MW

Generation Contribution:

 

(i)     Hydel share

     2323 MW

(ii)    WAPDA Thermal share

     1537 MW

(iii)   IPPs

     5917 MW

(iv)   Rental

        115 MW

 

DATE:18-04-2011

Generation

                       11023 MW      

Load Management 

        2720 MW

Computed Demand

                      13743 MW

KESC Export (Maximum)

     660 MW

Generation Contribution:

 

(i)     Hydel share

     2323 MW

(ii)    WAPDA Thermal share

     1896 MW

(iii)   IPPs

     6646 MW

(iv)   Rental

        158 MW



DATE:17-04-2011

Generation

                       11181 MW      

Load Management 

        2500 MW

Computed Demand

                      13681 MW

KESC Export (Maximum)

     650 MW

Generation Contribution:

 

(i)     Hydel share

     3080 MW

(ii)    WAPDA Thermal share

     1521 MW

(iii)   IPPs

     6433 MW

(iv)   Rental

        147 MW

 

DATE:15-04-2011

Generation

                       11008 MW      

Load Management 

        3965 MW

Computed Demand

                      14973 MW

KESC Export (Maximum)

     630 MW

Generation Contribution:

 

(i)     Hydel share

     2415 MW

(ii)    WAPDA Thermal share

     1896 MW

(iii)   IPPs

     6524 MW

(iv)   Rental

        173 MW

 

DATE:14-04-2011

Generation

                       11008 MW      

Load Management 

        3965 MW

Computed Demand

                      14973 MW

KESC Export (Maximum)

     670 MW

Generation Contribution:

 

(i)     Hydel share

     2415 MW

(ii)    WAPDA Thermal share

     1896 MW

(iii)   IPPs

     6524 MW

(iv)   Rental

        173 MW

 


DATE:13-04-2011
 

Generation

                       11033 MW      

Load Management 

        3135 MW

Computed Demand

                      14168 MW

KESC Export (Maximum)

     710 MW

Generation Contribution:

 

(i)     Hydel share

     2477 MW

(ii)    WAPDA Thermal share

     2088 MW

(iii)   IPPs

     6406 MW

(iv)   Rental

        62 MW

 


DATE:10-04-2011
 

Generation

                       10700 MW      

Load Management 

        3002 MW

Computed Demand

                      13702 MW

KESC Export (Maximum)

     700 MW

Generation Contribution:

 

(i)     Hydel share

     2662 MW

(ii)    WAPDA Thermal share

     1782 MW

(iii)   IPPs

     6194 MW

(iv)   Rental

        62 MW

 

DATE:08-04-2011

Generation

                       11231 MW      

Load Management 

        3100 MW

Computed Demand

                      14331 MW

KESC Export (Maximum)

     780 MW

Generation Contribution:

 

(i)     Hydel share

     3597 MW

(ii)    WAPDA Thermal share

     1620 MW

(iii)   IPPs

     5952 MW

(iv)   Rental

        62 MW



DATE:07-04-2011
 

Generation

                       9842 MW      

Load Management 

        3250 MW

Computed Demand

                      13092 MW

KESC Export (Maximum)

     700 MW

Generation Contribution:

 

(i)     Hydel share

     3051 MW

(ii)    WAPDA Thermal share

     1877 MW

(iii)   IPPs

     4852 MW

(iv)   Rental

        62 MW

 



DATE:06-04-2011

Generation

                       10554 MW      

Load Management 

        3120 MW

Computed Demand

                      13674 MW

KESC Export (Maximum)

     890 MW

Generation Contribution:

 

(i)     Hydel share

     3607 MW

(ii)    WAPDA Thermal share

     1910 MW

(iii)   IPPs

     4975 MW

(iv)   Rental

        62 MW



DATE:05-04-2011

Generation

                      10836 MW      

Load Management 

         2995 MW

Computed Demand

                      13831 MW

KESC Export (Maximum)

     700 MW

Generation Contribution:

 

(i)     Hydel share

     3798 MW

(ii)    WAPDA Thermal share

     1997 MW

(iii)   IPPs

     4979 MW

(iv)   Rental

        62 MW



DATE:04-04-2011

Generation

                      10783 MW      

Load Management 

         2310 MW

Computed Demand

                      13093 MW

KESC Export (Maximum)

     720 MW

Generation Contribution:

 

(i)     Hydel share

     4199 MW

(ii)    WAPDA Thermal share

     1771 MW

(iii)   IPPs

     4751 MW

(iv)   Rental

        62 MW



DATE:03-04-2011
 

Generation

                      11683 MW      

Load Management 

         1120 MW

Computed Demand

                      12803 MW

KESC Export (Maximum)

     690 MW

Generation Contribution:

 

(i)     Hydel share

     4027 MW

(ii)    WAPDA Thermal share

     1733 MW

(iii)   IPPs

     5861 MW

(iv)   Rental

        62 MW



DATE:01-04-2011
 

Generation

                      11790 MW      

Load Management 

         1425 MW

Computed Demand

                      13215 MW

KESC Export (Maximum)

     710 MW

Generation Contribution:

 

(i)     Hydel share

     3770 MW

(ii)    WAPDA Thermal share

     1921 MW

(iii)   IPPs

     6037 MW

(iv)   Rental

        62 MW



DATE:31-03-2011

Generation

                      11777 MW      

Load Management 

         1410 MW

Computed Demand

                      13187 MW

KESC Export (Maximum)

     720 MW

Generation Contribution:

 

(i)     Hydel share

     4268 MW

(ii)    WAPDA Thermal share

     1867 MW

(iii)   IPPs

     5580 MW

(iv)   Rental

        62 MW

 



DATE:30-03-2011
 

Generation

                      12450 MW      

Load Management 

          255 MW

Computed Demand

                      12705 MW

KESC Export (Maximum)

     690 MW

Generation Contribution:

 

(i)     Hydel share

     3850 MW

(ii)    WAPDA Thermal share

     1991 MW

(iii)   IPPs

     6399 MW

(iv)   Rental

        62 MW



DATE:29-03-2011

Generation

                      11715 MW      

Load Management 

                MW

Computed Demand

                                 MW

KESC Export (Maximum)

     690 MW

Generation Contribution:

 

(i)     Hydel share

     3700 MW

(ii)    WAPDA Thermal share

     1818 MW

(iii)   IPPs

     6135 MW

(iv)   Rental

        62 MW

 

DATE:28-03-2011 

Generation

                      11875 MW      

Load Management 

       1475 MW

Computed Demand

                      13350 MW

KESC Export (Maximum)

     700 MW

Generation Contribution:

 

(i)     Hydel share

     3946 MW

(ii)    WAPDA Thermal share

     2011 MW

(iii)   IPPs

     5856 MW

(iv)   Rental

        62 MW



DATE: 27-03-2011

Generation

                      11920 MW      

Load Management 

       1525 MW

Computed Demand

                      13445 MW

KESC Export (Maximum)

     710 MW

Generation Contribution:

 

(i)     Hydel share

     3940 MW

(ii)    WAPDA Thermal share

     1897 MW

(iii)   IPPs

     6021 MW

(iv)   Rental

        62 MW



DATE:25-03-2011

Generation

                      11903 MW      

Load Management 

       1435 MW

Computed Demand

                      13338 MW

KESC Export (Maximum)

     670 MW

Generation Contribution:

 

(i)     Hydel share

     3998 MW

(ii)    WAPDA Thermal share

     1879 MW

(iii)   IPPs

     5964 MW

(iv)   Rental

        62 MW



DATE:24-03-2011

Generation

                      11682 MW      

Load Management 

       1510 MW

Computed Demand

                      13192 MW

KESC Export (Maximum)

     690 MW

Generation Contribution:

 

(i)     Hydel share

     3735 MW

(ii)    WAPDA Thermal share

     1956 MW

(iii)   IPPs

     5929 MW

(iv)   Rental

        62 MW

 

DATE:23-03-2011

Generation

                      12096 MW      

Load Management 

       1235 MW

Computed Demand

                      13331 MW

KESC Export (Maximum)

     730 MW

Generation Contribution:

 

(i)     Hydel share

     3696 MW

(ii)    WAPDA Thermal share

     1988 MW

(iii)   IPPs

     6350 MW

(iv)   Rental

        62 MW

 

DATE:21-03-2011

Generation

                      11210 MW      

Load Management 

       2410 MW

Computed Demand

                      13620 MW

KESC Export (Maximum)

     710 MW

Generation Contribution:

 

(i)     Hydel share

     3733 MW

(ii)    WAPDA Thermal share

     2114 MW

(iii)   IPPs

     5301 MW

(iv)   Rental

        62 MW

 

DATE:18-03-2011 

Generation

                      11295 MW      

Load Management 

       2710 MW

Computed Demand

                      14005 MW

KESC Export (Maximum)

     710 MW

Generation Contribution:

 

(i)     Hydel share

     3454 MW

(ii)    WAPDA Thermal share

     2420 MW

(iii)   IPPs

     5359 MW

(iv)   Rental

        62 MW



DATE:17-03-2011

Generation

                      11290 MW      

Load Management 

       2223 MW

Computed Demand

                      13513 MW

KESC Export (Maximum)

     700 MW

Generation Contribution:

 

(i)     Hydel share

     3735 MW

(ii)    WAPDA Thermal share

     2206 MW

(iii)   IPPs

     5287 MW

(iv)   Rental

        62 MW

 

DATE:15-03-2011

Generation

                      11301 MW      

Load Management 

       1825 MW

Computed Demand

                      13126 MW

KESC Export (Maximum)

     700 MW

Generation Contribution:

 

(i)     Hydel share

     3760 MW

(ii)    WAPDA Thermal share

     2089 MW

(iii)   IPPs

     5390 MW

(iv)   Rental

        62 MW



DATE:14-03-2011

Generation

                      11240 MW      

Load Management 

       1785 MW

Computed Demand

                      13025 MW

KESC Export (Maximum)

     690 MW

Generation Contribution:

 

(i)     Hydel share

     3478 MW

(ii)    WAPDA Thermal share

     1886 MW

(iii)   IPPs

     5814 MW

(iv)   Rental

        62 MW

 

DATE:13-03-2011

Generation

                       11010 MW      

Load Management 

       1355 MW

Computed Demand

                      12365 MW

KESC Export (Maximum)

     720 MW

Generation Contribution:

 

(i)     Hydel share

     4002 MW

(ii)    WAPDA Thermal share

     1722 MW

(iii)   IPPs

     5224 MW

(iv)   Rental

        62 MW



DATE:11-03-2011

Generation

                       10985 MW      

Load Management 

       1002 MW

Computed Demand

                      11987 MW

KESC Export (Maximum)

     680 MW

Generation Contribution:

 

(i)     Hydel share

     4024 MW

(ii Thermal share

     1866 MW

(iii)   IPPs

     5033 MW

(iv)   Rental

        62 MW

 

DATE:09-03-2011

Generation

                       10212 MW      

Load Management 

       1380 MW

Computed Demand

                      11592 MW

KESC Export (Maximum)

     670 MW

Generation Contribution:

 

(i)     Hydel share

     3697 MW

(ii)    Thermal share

     1817 MW

(iii)   IPPs

     4636 MW

(iv)   Rental

        62 MW

 

DATE:08-03-2011

Generation

                       10203 MW      

Load Management 

       1505 MW

Computed Demand

                      11708 MW

KESC Export (Maximum)

     720 MW

Generation Contribution:

 

(i)     Hydel share

     3965 MW

(ii)    Thermal share

     1629 MW

(iii)   IPPs

     4547 MW

(iv)   Rental

        62 MW



DATE:07-03-2011
 

Generation

                       10263 MW      

Load Management 

       1423 MW

Computed Demand

                      11686 MW

KESC Export (Maximum)

     770 MW

Generation Contribution:

 

(i)     Hydel share

     3973 MW

(ii)   Thermal share

     1577 MW

(iii)   IPPs

     4651 MW

(iv)   Rental

        62 MW



 
DATE:04-03-2011 

Generation

                       10112 MW      

Load Management 

        962 MW

Computed Demand

                      11074 MW

KESC Export (Maximum)

     660 MW

Generation Contribution:

 

(i)     Hydel share

     3859 MW

(ii)    Thermal share

     1641 MW

(iii)   IPPs

     4550 MW

(iv)   Rental

        62 MW



DATE: 03-03-2011


Generation

                       10456 MW      

Load Management 

       995 MW

Computed Demand

                      11451 MW

KESC Export (Maximum)

     690 MW

Generation Contribution:

 

(i)     Hydel share

     4400 MW

(ii)    Thermal

     1567 MW

(iii)   IPPs

     4427 MW

(iv)   Rental

        62 MW

 

DATE:02-03-2011

Generation

                       10275 MW      

Load Management 

       1208 MW

Computed Demand

                      11483 MW

KESC Export (Maximum)

     700 MW

Generation Contribution:

 

(i)     Hydel share

     3708 MW

(ii)         Thermal

     1709 MW

(iii)   IPPs

     4796 MW

(iv)   Rental

        62 MW

 

DATE 01.03.2011

Generation

10440 MW

Load Management

1205 MW

Computed Demand

11645 MW

KESC Export (Maximum)

680 MW

Generation Contri9bution:

 

(i)         Hydel Share

4177 MW

(ii)         Thermal

1374 MW

(iii)       IPPs

4827 MW

(iv)      Rental

62 MW

Useful Links
 
 
  Services
WAPDA PITC
World Bank Ministry of Water & Power
Asian Development Bank NTDC
Pakistan Engineering Council Computer Society of Pakistan
 
   PEPCO Web Mail    Report Theft
   PEPCO Jobs    Consumer Complaint
   Downloads    Subscribe for our News feed
   Feedback    
 

Best viewed at resolution of 1280 x 1024 in Internet Explorer 6+
Site designed and developed by Information Technology Group,Office of Director General (I.S), PEPCO Computer Center HQ, WAPDA House, Lahore
 Copyrights 2009, Paksitan Electric Power Company, PEPCO All rights reserverd