DATE:19-05-2011
|
Generation |
12175 MW |
Load Management |
5985 MW |
Computed Demand |
18160 MW |
KESC Export (Maximum) |
700 MW |
Generation Contribution: |
|
(i) Hydel |
4928 MW |
(ii) PEPCO Thermal |
1267 MW |
(iii) IPPs |
5904 MW |
(iv) Rental |
76 MW |
DATE:16-05-2011
|
Generation |
13460 MW |
Load Management |
3330 MW |
Computed Demand |
16790 MW |
KESC Export (Maximum) |
710 MW |
Generation Contribution: |
|
(i) Hydel |
5086 MW |
(ii) PEPCO Thermal |
1549 MW |
(iii) IPPs |
6763 MW |
(iv) Rental |
62 MW |
DATE:14-05-2011
|
Generation |
13773 MW |
Load Management |
1940 MW |
Computed Demand |
15713 MW |
KESC Export (Maximum) |
600 MW |
Generation Contribution: |
|
(i) Hydel |
5073 MW |
(ii) PEPCO Thermal |
1352 MW |
(iii) IPPs |
7180 MW |
(iv) Rental |
168 MW |
DATE:13-05-2011
|
Generation |
13787 MW |
Load Management |
1988 MW |
Computed Demand |
15775 MW |
KESC Export (Maximum) |
690 MW |
Generation Contribution: |
|
(i) Hydel |
5002 MW |
(ii) PEPCO Thermal |
1349 MW |
(iii) IPPs |
7269 MW |
(iv) Rental |
167 MW |
DATE:12-05-2011
|
Generation |
13653 MW |
Load Management |
2630 MW |
Computed Demand |
16283 MW |
KESC Export (Maximum) |
750 MW |
Generation Contribution: |
|
(i) Hydel |
4923 MW |
(ii) PEPCO Thermal |
1352 MW |
(iii) IPPs |
7216 MW |
(iv) Rental |
162 MW |
DATE:11-05-2011
|
Generation |
13547 MW |
Load Management |
2520 MW |
Computed Demand |
16067 MW |
KESC Export (Maximum) |
710 MW |
Generation Contribution: |
|
(i) Hydel |
5020 MW |
(ii) PEPCO Thermal |
1639 MW |
(iii) IPPs |
6826 MW |
(iv) Rental |
62 MW |
|
DATE: 09-05-2011
|
Generation |
12999 MW |
Load Management |
2995 MW |
Computed Demand |
15994 MW |
KESC Export (Maximum) |
730 MW |
Generation Contribution: |
|
(i) Hydel |
4768 MW |
(ii) Thermal |
1791 MW |
(iii) IPPs |
6373 MW |
(iv) Rental |
67 MW |
DATE:07-05-2011
Generation |
12452 MW |
Load Management |
2580 MW |
Computed Demand |
15032 MW |
KESC Export (Maximum) |
720 MW |
Generation Contribution: |
|
(i) Hydel |
4711 MW |
(ii) PEPCO Thermal |
1714 MW |
(iii) IPPs |
5959 MW |
(iv) Rental |
68 MW |
DATE:06-05-2011
Generation |
12411 MW |
Load Management |
2730 MW |
Computed Demand |
15141 MW |
KESC Export (Maximum) |
740 MW |
Generation Contribution: |
|
(i) Hydel |
4341 MW |
(ii) PEPCO Thermal |
1540 MW |
(iii) IPPs |
6468 MW |
(iv) Rental |
62 MW |
DATE:05-05-2011
Generation |
12272 MW |
Load Management |
5602 MW |
Computed Demand |
17874 MW |
KESC Export (Maximum) |
750 MW |
Generation Contribution: |
|
(i) Hydel |
4657 MW |
(ii) PEPCO Thermal |
1482 MW |
(iii) IPPs |
6071 MW |
(iv) Rental |
62 MW |
DATE:04-05-2011
Generation |
12272 MW |
Load Management |
5244 MW |
Computed Demand |
16997 MW |
KESC Export (Maximum) |
750 MW |
Generation Contribution: |
|
(i) Hydel |
4657 MW |
(ii) PEPCO Thermal |
1482 MW |
(iii) IPPs |
6071 MW |
(iv) Rental |
62 MW |
|
DATE:03-05-2011
Generation |
11753 MW |
Load Management |
5244 MW |
Computed Demand |
16997 MW |
KESC Export (Maximum) |
760 MW |
Generation Contribution: |
|
(i) Hydel |
4408 MW |
(ii) PEPCO Thermal |
1426 MW |
(iii) IPPs |
5857 MW |
(iv) Rental |
62 MW |
DATE:02-05-2011
Generation |
11080 MW |
Load Management |
5890 MW |
Computed Demand |
16970 MW |
KESC Export (Maximum) |
745 MW |
Generation Contribution: |
|
(i) Hydel |
4247 MW |
(ii) PEPCO Thermal |
1183 MW |
(iii) IPPs |
5588 MW |
(iv) Rental |
62 MW |
DATE:01-05-2011
Generation |
11725 MW |
Load Management |
4738 MW |
Computed Demand |
16463 MW |
KESC Export (Maximum) |
810 MW |
Generation Contribution: |
|
(i) Hydel |
4233 MW |
(ii) PEPCO Thermal |
1199 MW |
(iii) IPPs |
6209 MW |
(iv) Rental |
84 MW |
DATE:29-04-2011
Generation |
12259 MW |
Load Management |
3881 MW |
Computed Demand |
16140 MW |
KESC Export (Maximum) |
710 MW |
Generation Contribution: |
|
(i) Hydel |
4181 MW |
(ii) PEPCO Thermal |
1806 MW |
(iii) IPPs |
6210 MW |
(iv) Rental |
62 MW |
DATE:28-04-2011
Generation |
12229 MW |
Load Management |
3891 MW |
Computed Demand |
16120 MW |
KESC Export (Maximum) |
730 MW |
Generation Contribution: |
|
(i) Hydel |
4005 MW |
(ii) PEPCO Thermal |
1745 MW |
(iii) IPPs |
6417 MW |
(iv) Rental |
62 MW |
DATE:27-04-2011
Generation |
12269 MW |
Load Management |
3821 MW |
Computed Demand |
16090 MW |
KESC Export (Maximum) |
730 MW |
Generation Contribution: |
|
(i) Hydel |
4068 MW |
(ii) PEPCO Thermal |
1818 MW |
(iii) IPPs |
6365 MW |
(iv) Rental |
18 MW |
|
DATE:26-04-2011
Generation |
12054 MW |
Load Management |
3995 MW |
Computed Demand |
16049 MW |
KESC Export (Maximum) |
720 MW |
Generation Contribution: |
|
(i) Hydel |
3931 MW |
(ii) PEPCO Thermal |
1825 MW |
(iii) IPPs |
6236 MW |
(iv) Rental |
62 MW |
DATE:25-04-2011
Generation |
11315 MW |
Load Management |
4879 MW |
Computed Demand |
16194 MW |
KESC Export (Maximum) |
730 MW |
Generation Contribution: |
|
(i) Hydel share |
3834 MW |
(ii) WAPDA Thermal share |
1568 MW |
(iii) IPPs |
5851 MW |
(iv) Rental |
62 MW |
DATE:24-04-2011
Generation |
10125 MW |
Load Management |
5878 MW |
Computed Demand |
16003 MW |
KESC Export (Maximum) |
730 MW |
Generation Contribution: |
|
(i) Hydel share |
3035 MW |
(ii) WAPDA Thermal share |
1466 MW |
(iii) IPPs |
5562 MW |
(iv) Rental |
62 MW |
DATE:22-04-2011
Generation |
9788 MW |
Load Management |
5722 MW |
Computed Demand |
15510 MW |
KESC Export (Maximum) |
660 MW |
Generation Contribution: |
|
(i) Hydel share |
2486 MW |
(ii) WAPDA Thermal share |
1390 MW |
(iii) IPPs |
5670 MW |
(iv) Rental |
242 MW |
DATE:21-04-2011
Generation |
9465 MW |
Load Management |
5010 MW |
Computed Demand |
14475 MW |
KESC Export (Maximum) |
650 MW |
Generation Contribution: |
|
(i) Hydel share |
2585 MW |
(ii) WAPDA Thermal share |
1396 MW |
(iii) IPPs |
5333 MW |
(iv) Rental |
151 MW |
DATE:20-04-2011
Generation |
9892 MW |
Load Management |
4620 MW |
Computed Demand |
14512 MW |
KESC Export (Maximum) |
710 MW |
Generation Contribution: |
|
(i) Hydel share |
2323 MW |
(ii) WAPDA Thermal share |
1537 MW |
(iii) IPPs |
5917 MW |
(iv) Rental |
115 MW |
DATE:18-04-2011
Generation |
11023 MW |
Load Management |
2720 MW |
Computed Demand |
13743 MW |
KESC Export (Maximum) |
660 MW |
Generation Contribution: |
|
(i) Hydel share |
2323 MW |
(ii) WAPDA Thermal share |
1896 MW |
(iii) IPPs |
6646 MW |
(iv) Rental |
158 MW |
DATE:17-04-2011
Generation |
11181 MW |
Load Management |
2500 MW |
Computed Demand |
13681 MW |
KESC Export (Maximum) |
650 MW |
Generation Contribution: |
|
(i) Hydel share |
3080 MW |
(ii) WAPDA Thermal share |
1521 MW |
(iii) IPPs |
6433 MW |
(iv) Rental |
147 MW |
|
DATE:15-04-2011
Generation |
11008 MW |
Load Management |
3965 MW |
Computed Demand |
14973 MW |
KESC Export (Maximum) |
630 MW |
Generation Contribution: |
|
(i) Hydel share |
2415 MW |
(ii) WAPDA Thermal share |
1896 MW |
(iii) IPPs |
6524 MW |
(iv) Rental |
173 MW |
DATE:14-04-2011
Generation |
11008 MW |
Load Management |
3965 MW |
Computed Demand |
14973 MW |
KESC Export (Maximum) |
670 MW |
Generation Contribution: |
|
(i) Hydel share |
2415 MW |
(ii) WAPDA Thermal share |
1896 MW |
(iii) IPPs |
6524 MW |
(iv) Rental |
173 MW |
DATE:13-04-2011
Generation |
11033 MW |
Load Management |
3135 MW |
Computed Demand |
14168 MW |
KESC Export (Maximum) |
710 MW |
Generation Contribution: |
|
(i) Hydel share |
2477 MW |
(ii) WAPDA Thermal share |
2088 MW |
(iii) IPPs |
6406 MW |
(iv) Rental |
62 MW |
DATE:10-04-2011
Generation |
10700 MW |
Load Management |
3002 MW |
Computed Demand |
13702 MW |
KESC Export (Maximum) |
700 MW |
Generation Contribution: |
|
(i) Hydel share |
2662 MW |
(ii) WAPDA Thermal share |
1782 MW |
(iii) IPPs |
6194 MW |
(iv) Rental |
62 MW |
DATE:08-04-2011
Generation |
11231 MW |
Load Management |
3100 MW |
Computed Demand |
14331 MW |
KESC Export (Maximum) |
780 MW |
Generation Contribution: |
|
(i) Hydel share |
3597 MW |
(ii) WAPDA Thermal share |
1620 MW |
(iii) IPPs |
5952 MW |
(iv) Rental |
62 MW |
DATE:07-04-2011
Generation |
9842 MW |
Load Management |
3250 MW |
Computed Demand |
13092 MW |
KESC Export (Maximum) |
700 MW |
Generation Contribution: |
|
(i) Hydel share |
3051 MW |
(ii) WAPDA Thermal share |
1877 MW |
(iii) IPPs |
4852 MW |
(iv) Rental |
62 MW |
|
DATE:06-04-2011
Generation |
10554 MW |
Load Management |
3120 MW |
Computed Demand |
13674 MW |
KESC Export (Maximum) |
890 MW |
Generation Contribution: |
|
(i) Hydel share |
3607 MW |
(ii) WAPDA Thermal share |
1910 MW |
(iii) IPPs |
4975 MW |
(iv) Rental |
62 MW |
DATE:05-04-2011
Generation |
10836 MW |
Load Management |
2995 MW |
Computed Demand |
13831 MW |
KESC Export (Maximum) |
700 MW |
Generation Contribution: |
|
(i) Hydel share |
3798 MW |
(ii) WAPDA Thermal share |
1997 MW |
(iii) IPPs |
4979 MW |
(iv) Rental |
62 MW |
DATE:04-04-2011
Generation |
10783 MW |
Load Management |
2310 MW |
Computed Demand |
13093 MW |
KESC Export (Maximum) |
720 MW |
Generation Contribution: |
|
(i) Hydel share |
4199 MW |
(ii) WAPDA Thermal share |
1771 MW |
(iii) IPPs |
4751 MW |
(iv) Rental |
62 MW |
DATE:03-04-2011
Generation |
11683 MW |
Load Management |
1120 MW |
Computed Demand |
12803 MW |
KESC Export (Maximum) |
690 MW |
Generation Contribution: |
|
(i) Hydel share |
4027 MW |
(ii) WAPDA Thermal share |
1733 MW |
(iii) IPPs |
5861 MW |
(iv) Rental |
62 MW |
DATE:01-04-2011
Generation |
11790 MW |
Load Management |
1425 MW |
Computed Demand |
13215 MW |
KESC Export (Maximum) |
710 MW |
Generation Contribution: |
|
(i) Hydel share |
3770 MW |
(ii) WAPDA Thermal share |
1921 MW |
(iii) IPPs |
6037 MW |
(iv) Rental |
62 MW |
DATE:31-03-2011
Generation |
11777 MW |
Load Management |
1410 MW |
Computed Demand |
13187 MW |
KESC Export (Maximum) |
720 MW |
Generation Contribution: |
|
(i) Hydel share |
4268 MW |
(ii) WAPDA Thermal share |
1867 MW |
(iii) IPPs |
5580 MW |
(iv) Rental |
62 MW |
DATE:30-03-2011
Generation |
12450 MW |
Load Management |
255 MW |
Computed Demand |
12705 MW |
KESC Export (Maximum) |
690 MW |
Generation Contribution: |
|
(i) Hydel share |
3850 MW |
(ii) WAPDA Thermal share |
1991 MW |
(iii) IPPs |
6399 MW |
(iv) Rental |
62 MW |
DATE:29-03-2011
Generation |
11715 MW |
Load Management |
MW |
Computed Demand |
MW |
KESC Export (Maximum) |
690 MW |
Generation Contribution: |
|
(i) Hydel share |
3700 MW |
(ii) WAPDA Thermal share |
1818 MW |
(iii) IPPs |
6135 MW |
(iv) Rental |
62 MW |
DATE:28-03-2011
Generation |
11875 MW |
Load Management |
1475 MW |
Computed Demand |
13350 MW |
KESC Export (Maximum) |
700 MW |
Generation Contribution: |
|
(i) Hydel share |
3946 MW |
(ii) WAPDA Thermal share |
2011 MW |
(iii) IPPs |
5856 MW |
(iv) Rental |
62 MW |
DATE: 27-03-2011
Generation |
11920 MW |
Load Management |
1525 MW |
Computed Demand |
13445 MW |
KESC Export (Maximum) |
710 MW |
Generation Contribution: |
|
(i) Hydel share |
3940 MW |
(ii) WAPDA Thermal share |
1897 MW |
(iii) IPPs |
6021 MW |
(iv) Rental |
62 MW |
|
DATE:25-03-2011
Generation |
11903 MW |
Load Management |
1435 MW |
Computed Demand |
13338 MW |
KESC Export (Maximum) |
670 MW |
Generation Contribution: |
|
(i) Hydel share |
3998 MW |
(ii) WAPDA Thermal share |
1879 MW |
(iii) IPPs |
5964 MW |
(iv) Rental |
62 MW |
DATE:24-03-2011
Generation |
11682 MW |
Load Management |
1510 MW |
Computed Demand |
13192 MW |
KESC Export (Maximum) |
690 MW |
Generation Contribution: |
|
(i) Hydel share |
3735 MW |
(ii) WAPDA Thermal share |
1956 MW |
(iii) IPPs |
5929 MW |
(iv) Rental |
62 MW |
DATE:23-03-2011
Generation |
12096 MW |
Load Management |
1235 MW |
Computed Demand |
13331 MW |
KESC Export (Maximum) |
730 MW |
Generation Contribution: |
|
(i) Hydel share |
3696 MW |
(ii) WAPDA Thermal share |
1988 MW |
(iii) IPPs |
6350 MW |
(iv) Rental |
62 MW |
DATE:21-03-2011
Generation |
11210 MW |
Load Management |
2410 MW |
Computed Demand |
13620 MW |
KESC Export (Maximum) |
710 MW |
Generation Contribution: |
|
(i) Hydel share |
3733 MW |
(ii) WAPDA Thermal share |
2114 MW |
(iii) IPPs |
5301 MW |
(iv) Rental |
62 MW |
DATE:18-03-2011
Generation |
11295 MW |
Load Management |
2710 MW |
Computed Demand |
14005 MW |
KESC Export (Maximum) |
710 MW |
Generation Contribution: |
|
(i) Hydel share |
3454 MW |
(ii) WAPDA Thermal share |
2420 MW |
(iii) IPPs |
5359 MW |
(iv) Rental |
62 MW |
DATE:17-03-2011
Generation |
11290 MW |
Load Management |
2223 MW |
Computed Demand |
13513 MW |
KESC Export (Maximum) |
700 MW |
Generation Contribution: |
|
(i) Hydel share |
3735 MW |
(ii) WAPDA Thermal share |
2206 MW |
(iii) IPPs |
5287 MW |
(iv) Rental |
62 MW |
DATE:15-03-2011
Generation |
11301 MW |
Load Management |
1825 MW |
Computed Demand |
13126 MW |
KESC Export (Maximum) |
700 MW |
Generation Contribution: |
|
(i) Hydel share |
3760 MW |
(ii) WAPDA Thermal share |
2089 MW |
(iii) IPPs |
5390 MW |
(iv) Rental |
62 MW |
DATE:14-03-2011
Generation |
11240 MW |
Load Management |
1785 MW |
Computed Demand |
13025 MW |
KESC Export (Maximum) |
690 MW |
Generation Contribution: |
|
(i) Hydel share |
3478 MW |
(ii) WAPDA Thermal share |
1886 MW |
(iii) IPPs |
5814 MW |
(iv) Rental |
62 MW |
DATE:13-03-2011
Generation |
11010 MW |
Load Management |
1355 MW |
Computed Demand |
12365 MW |
KESC Export (Maximum) |
720 MW |
Generation Contribution: |
|
(i) Hydel share |
4002 MW |
(ii) WAPDA Thermal share |
1722 MW |
(iii) IPPs |
5224 MW |
(iv) Rental |
62 MW |
DATE:11-03-2011
Generation |
10985 MW |
Load Management |
1002 MW |
Computed Demand |
11987 MW |
KESC Export (Maximum) |
680 MW |
Generation Contribution: |
|
(i) Hydel share |
4024 MW |
(ii Thermal share |
1866 MW |
(iii) IPPs |
5033 MW |
(iv) Rental |
62 MW |
DATE:09-03-2011
Generation |
10212 MW |
Load Management |
1380 MW |
Computed Demand |
11592 MW |
KESC Export (Maximum) |
670 MW |
Generation Contribution: |
|
(i) Hydel share |
3697 MW |
(ii) Thermal share |
1817 MW |
(iii) IPPs |
4636 MW |
(iv) Rental |
62 MW |
DATE:08-03-2011
Generation |
10203 MW |
Load Management |
1505 MW |
Computed Demand |
11708 MW |
KESC Export (Maximum) |
720 MW |
Generation Contribution: |
|
(i) Hydel share |
3965 MW |
(ii) Thermal share |
1629 MW |
(iii) IPPs |
4547 MW |
(iv) Rental |
62 MW |
DATE:07-03-2011
Generation |
10263 MW |
Load Management |
1423 MW |
Computed Demand |
11686 MW |
KESC Export (Maximum) |
770 MW |
Generation Contribution: |
|
(i) Hydel share |
3973 MW |
(ii) Thermal share |
1577 MW |
(iii) IPPs |
4651 MW |
(iv) Rental |
62 MW |
DATE:04-03-2011
Generation |
10112 MW |
Load Management |
962 MW |
Computed Demand |
11074 MW |
KESC Export (Maximum) |
660 MW |
Generation Contribution: |
|
(i) Hydel share |
3859 MW |
(ii) Thermal share |
1641 MW |
(iii) IPPs |
4550 MW |
(iv) Rental |
62 MW |
DATE: 03-03-2011
Generation |
10456 MW |
Load Management |
995 MW |
Computed Demand |
11451 MW |
KESC Export (Maximum) |
690 MW |
Generation Contribution: |
|
(i) Hydel share |
4400 MW |
(ii) Thermal |
1567 MW |
(iii) IPPs |
4427 MW |
(iv) Rental |
62 MW |
DATE:02-03-2011
Generation |
10275 MW |
Load Management |
1208 MW |
Computed Demand |
11483 MW |
KESC Export (Maximum) |
700 MW |
Generation Contribution: |
|
(i) Hydel share |
3708 MW |
(ii) Thermal |
1709 MW |
(iii) IPPs |
4796 MW |
(iv) Rental |
62 MW |
DATE 01.03.2011
Generation |
10440 MW |
Load Management |
1205 MW |
Computed Demand |
11645 MW |
KESC Export (Maximum) |
680 MW |
Generation Contri9bution: |
|
(i) Hydel Share |
4177 MW |
(ii) Thermal |
1374 MW |
(iii) IPPs |
4827 MW |
(iv) Rental |
62 MW |
|