DATE: 09-05-2011

Generation

                       12999 MW 

Load Management 

      2995 MW

Computed Demand

                      15994 MW

KESC Export (Maximum)

    730 MW

Generation Contribution:

 

(i)     Hydel

     4768 MW

(ii)    Thermal

     1791 MW

(iii)   IPPs

     6373 MW

(iv)   Rental

        67 MW


 

DATE: 28 -01-2011

 

Generation

                    11011 MW

Load Management

   1480 MW

Computed Demand

                     12491 MW

KESC Export (Maximum)

   720 MW

Generation Contribution:

 

(i)     Hydel

     3490 MW

(ii)    PEPCO Thermal

     1846 MW

(iii)   IPPs

     5613 MW

(iv)   Rental

        62 MW

 

DATE: 27 -01-2011

 

Generation

                    11210 MW

Load Management

   1525 MW

Computed Demand

                     12735 MW

KESC Export (Maximum)

   660 MW

Generation Contribution:

 

(i)     Hydel

     3520 MW

(ii)    PEPCO Thermal

     1972 MW

(iii)   IPPs

     5656 MW

(iv)   Rental

        62 MW

DATE: 26 -01-2011

 

Generation

                    10827 MW

Load Management

   1552 MW

Computed Demand

                     12379 MW

KESC Export (Maximum)

   710 MW

Generation Contribution:

 

(i)     Hydel

     3530 MW

(ii)    PEPCO Thermal

     2075 MW

(iii)   IPPs

     5160 MW

(iv)   Rental

        62 MW

DATE: 25 -01-2011

 

Generation

                    10463 MW

Load Management

   1626 MW

Computed Demand

                     12089 MW

KESC Export (Maximum)

   710 MW

Generation Contribution:

 

(i)     Hydel

     3137 MW

(ii)    PEPCO Thermal

     2126 MW

(iii)   IPPs

     5138 MW

(iv)   Rental

        62 MW

DATE: 24 -01-2011

 

Generation

                    10487 MW

Load Management

   1615 MW

Computed Demand

                     12102 MW

KESC Export (Maximum)

   650 MW

Generation Contribution:

 

(i)     Hydel

     3194 MW

(ii)    PEPCO Thermal

     2118 MW

(iii)   IPPs

     5113 MW

(iv)   Rental

        62 MW

 

DATE: 22 -01-2011

 

Generation

                    10515 MW

Load Management

   1635 MW

Computed Demand

                     12150 MW

KESC Export (Maximum)

   690 MW

Generation Contribution:

 

(i)     Hydel

     2708 MW

(ii)    PEPCO Thermal

     2212 MW

(iii)   IPPs

     5533 MW

(iv)   Rental

        62 MW


ATE: 21 -01-2011

 

Generation

                    10955 MW

Load Management

   1710 MW

Computed Demand

                     12665 MW

KESC Export (Maximum)

   690 MW

Generation Contribution:

 

(i)     Hydel

     2843 MW

(ii)    PEPCO Thermal

     2190 MW

(iii)   IPPs

     5860 MW

(iv)   Rental

        62 MW


DATE: 20 -01-2011

 

Generation

                    10855 MW

Load Management

   2290 MW

Computed Demand

                     13145 MW

KESC Export (Maximum)

   670 MW

Generation Contribution:

 

(i)     Hydel

     2860 MW

(ii)    PEPCO Thermal

     2132 MW

(iii)   IPPs

     5801 MW

(iv)   Rental

        62 MW


DATE: 19 -01-2011

 

Generation

                    10220 MW

Load Management

   2320 MW

Computed Demand

                     12540 MW

KESC Export (Maximum)

   750 MW

Generation Contribution:

 

(i)     Hydel

     2820 MW

(ii)    PEPCO Thermal

     2068 MW

(iii)   IPPs

     5270 MW

(iv)   Rental

        62 MW


DATE: 18 -01-2011

 

Generation

                    10165 MW

Load Management

   2390 MW

Computed Demand

                     12555 MW

KESC Export (Maximum)

   670 MW

Generation Contribution:

 

(i)     Hydel

     2454 MW

(ii)    PEPCO Thermal

     2150 MW

(iii)   IPPs

     5499 MW

(iv)   Rental

        62 MW


DATE: 17 -01-2011

 

Generation

                    10240MW

Load Management

   2401 MW

Computed Demand

                     12641 MW

KESC Export (Maximum)

   660 MW

Generation Contribution:

 

(i)     Hydel

     2344 MW

(ii)    PEPCO Thermal

     2141 MW

(iii)   IPPs

     5693 MW

(iv)   Rental

        62 MW


DATE: 16 -01-2011

 

Generation

                    10240MW

Load Management

   2401 MW

Computed Demand

                     12641 MW

KESC Export (Maximum)

   660 MW

Generation Contribution:

 

(i)     Hydel

     2344 MW

(ii)    PEPCO Thermal

     2141 MW

(iii)   IPPs

     5693 MW

(iv)   Rental

        62 MW


DATE: 15 -01-2011

 

Generation

                    9420 MW

Load Management

   2421 MW

Computed Demand

                     11841 MW

KESC Export (Maximum)

   670 MW

Generation Contribution:

 

(i)     Hydel

     1982 MW

(ii)    PEPCO Thermal

     1938 MW

(iii)   IPPs

     5438 MW

(iv)   Rental

        62 MW


DATE: 13 -01-2011

 

Generation

                    9035 MW

Load Management

   2998 MW

Computed Demand

                     12033 MW

KESC Export (Maximum)

   700 MW

Generation Contribution:

 

(i)     Hydel

     1511 MW

(ii)    PEPCO Thermal

     1699 MW

(iii)   IPPs

     5563 MW

(iv)   Rental

        62 MW


DATE: 12 -01-2011

 

Generation

                    9411 MW

Load Management

   2995 MW

Computed Demand

                     12406 MW

KESC Export (Maximum)

   730 MW

Generation Contribution:

 

(i)     Hydel

     1865 MW

(ii)    PEPCO Thermal

     1671 MW

(iii)   IPPs

     5813 MW

(iv)   Rental

        62 MW


DATE: 11 -01-2011

 

Generation

                    9990 MW

Load Management

   2990 MW

Computed Demand

                     12980 MW

KESC Export (Maximum)

   710 MW

Generation Contribution:

 

(i)     Hydel

     2026 MW

(ii)    PEPCO Thermal

     1519 MW

(iii)   IPPs

     6383 MW

(iv)   Rental

        62 MW

 

DATE: 10 -01-2011

 

Generation

                    10321 MW

Load Management

   2965 MW

Computed Demand

                     13286 MW

KESC Export (Maximum)

   640 MW

Generation Contribution:

 

(i)     Hydel

     1793 MW

(ii)    PEPCO Thermal

     1785 MW

(iii)   IPPs

     6681 MW

(iv)   Rental

        62 MW

 

DATE: 09 -01-2011

 

Generation

                    10721 MW

Load Management

   2945 MW

Computed Demand

                     13666 MW

KESC Export (Maximum)

         720 MW

Generation Contribution:

 

(i)     Hydel

     1793 MW

(ii)    PEPCO Thermal

     1672 MW

(iii)   IPPs

     6474 MW

(iv)   Rental

        62 MW


DATE: 08 -01-2011

 

Generation

                    8776 MW

Load Management

   2930 MW

Computed Demand

                     11706 MW

KESC Export (Maximum)

         710 MW

Generation Contribution:

 

(i)     Hydel

     1049 MW

(ii)    PEPCO Thermal

     1287 MW

(iii)   IPPs

     6387 MW

(iv)   Rental

        62 MW

 

DATE: 07 -01-2011

 

Generation

                    9737 MW

Load Management

   2880 MW

Computed Demand

                     12617 MW

KESC Export (Maximum)

         690 MW

Generation Contribution:

 

(i)     Hydel

     1952 MW

(ii)    PEPCO Thermal

     1383 MW

(iii)   IPPs

     6340 MW

(iv)   Rental

        62 MW


DATE: 06 -01-2011

 

Generation

                    10065 MW

Load Management

   2520 MW

Computed Demand

                     12585 MW

KESC Export (Maximum)

         700 MW

Generation Contribution:

 

(i)     Hydel

     1994 MW

(ii)    PEPCO Thermal

     1570 MW

(iii)   IPPs

     6439 MW

(iv)   Rental

        62 MW

DATE: 04 -01-2011

 

Generation

                    10037 MW

Load Management

   2445 MW

Computed Demand

                     12482 MW

KESC Export (Maximum)

         690 MW

Generation Contribution:

 

(i)     Hydel

     2124 MW

(ii)    PEPCO Thermal

     1684 MW

(iii)   IPPs

     6167 MW

(iv)   Rental

        62 MW


DATE: 03 -01-2011

 

Generation

                    10180 MW

Load Management

   2437 MW

Computed Demand

                     12617 MW

KESC Export (Maximum)

         670 MW

Generation Contribution:

 

(i)     Hydel

     2340 MW

(ii)    PEPCO Thermal

     1663 MW

(iii)   IPPs

     6115 MW

(iv)   Rental

        62 MW


DATE: 02 -01-2011

 

Generation

                    9721 MW

Load Management

   2495 MW

Computed Demand

                     12216 MW

KESC Export (Maximum)

         660 MW

Generation Contribution:

 

(i)     Hydel

     2616 MW

(ii)    PEPCO Thermal

     853 MW

(iii)   IPPs

     6190 MW

(iv)   Rental

        62 MW


DATE: 01 -01-2011

 

Generation

                    9830 MW

Load Management

   2382 MW

Computed Demand

                     12212 MW

KESC Export (Maximum)

         670 MW

Generation Contribution:

 

(i)     Hydel

     2641 MW

(ii)    PEPCO Thermal

     1431 MW

(iii)   IPPs

     5696 MW

(iv)   Rental

        62 MW


DATE: 31 -12-2010

 

Generation

                    10079 MW

Load Management

   2527 MW

Computed Demand

                     12606 MW

KESC Export (Maximum)

         670 MW

Generation Contribution:

 

(i)     Hydel

     2611 MW

(ii)    PEPCO Thermal

     1528 MW

(iii)   IPPs

     5878 MW

(iv)   Rental

        62 MW



DATE: 30 -12-2010

 

Generation

                    10032 MW

Load Management

   2615 MW

Computed Demand

                     12647 MW

KESC Export (Maximum)

         690 MW

Generation Contribution:

 

(i)     Hydel

     2243 MW

(ii)    PEPCO Thermal

     1409 MW

(iii)   IPPs

     6318 MW

(iv)   Rental

        62 MW

DATE: 29-12-2010

 

Generation

                    10142 MW

Load Management

   2953 MW

Computed Demand

                     13095 MW

KESC Export (Maximum)

         710 MW

Generation Contribution:

 

(i)     Hydel

     2223 MW

(ii)    PEPCO Thermal

     1555 MW

(iii)   IPPs

     6302 MW

(iv)   Rental

        62 MW

DATE: 28-12-2010

 

Generation

                    10015 MW

Load Management

   2916 MW

Computed Demand

                     12931 MW

KESC Export (Maximum)

         690 MW

Generation Contribution:

 

(i)     Hydel

     2565 MW

(ii)    PEPCO Thermal

     1546 MW

(iii)   IPPs

     5842 MW

(iv)   Rental

        62 MW

DATE: 27-12-2010

 

Generation

                    9740 MW

Load Management

   2995 MW

Computed Demand

                     12735 MW

KESC Export (Maximum)

         690 MW

Generation Contribution:

 

(i)     Hydel

     2557 MW

(ii)    PEPCO Thermal

     1550 MW

(iii)   IPPs

     5571 MW

(iv)   Rental

        62 MW

DATE: 23-11 -2010

 

Generation

                    11365 MW

Load Management

   141 MW

Computed Demand

                     11492 MW

KESC Export (Maximum)

         700 MW

Generation Contribution:

 

(i)     Hydel

     5060 MW

(ii)    PEPCO Thermal

     1324 MW

(iii)   IPPs

     4919 MW

(iv)   Rental

        62 MW

DATE: 22-11 -2010

 

Generation

                    11862 MW

Load Management

   141 MW

Computed Demand

                     12003 MW

KESC Export (Maximum)

         730 MW

Generation Contribution:

 

(i)     Hydel

     5094 MW

(ii)    PEPCO Thermal

     1328 MW

(iii)   IPPs

     5378 MW

(iv)   Rental

        62 MW

DATE: 21-11 -2010

 

Generation

                    11343 MW

Load Management

   134 MW

Computed Demand

                     11477 MW

KESC Export (Maximum)

         740 MW

Generation Contribution:

 

(i)     Hydel

     4451 MW

(ii)    PEPCO Thermal

     1108 MW

(iii)   IPPs

     5722 MW

(iv)   Rental

        62 MW

DATE: 20-11 -2010

 

Generation

                    11685 MW

Load Management

   120 MW

Computed Demand

                     11805 MW

KESC Export (Maximum)

         690 MW

Generation Contribution:

 

(i)     Hydel

     5061 MW

(ii)    PEPCO Thermal

     1101 MW

(iii)   IPPs

     5461 MW

(iv)   Rental

        62 MW


DATE: 19-11 -2010

 

Generation

                    11652 MW

Load Management

    NIL MW

Computed Demand

                     11652 MW

KESC Export (Maximum)

         710 MW

Generation Contribution:

 

(i)     Hydel

     4923 MW

(ii)    PEPCO Thermal

     1074 MW

(iii)   IPPs

     5593 MW

(iv)   Rental

        62 MW

DATE: 18-11 -2010

 

Generation

                    9800 MW

Load Management

    NIL MW

Computed Demand

                     9800 MW

KESC Export (Maximum)

         580 MW

Generation Contribution:

 

(i)     Hydel

     4978 MW

(ii)    PEPCO Thermal

     991 MW

(iii)   IPPs

     3769 MW

(iv)   Rental

        62 MW

 

DATE: 17-11 -2010

 

Generation

                    10852 MW

Load Management

    82 MW

Computed Demand

                     10934 MW

KESC Export (Maximum)

         690 MW

Generation Contribution:

 

(i)     Hydel

     4672 MW

(ii)    PEPCO Thermal

     1023 MW

(iii)   IPPs

     5095 MW

(iv)   Rental

        62 MW

DATE: 16-11 -2010

 

Generation

                    11209 MW

Load Management

    957 MW

Computed Demand

                     12166 MW

KESC Export (Maximum)

         720 MW

Generation Contribution:

 

(i)     Hydel

     5215 MW

(ii)    PEPCO Thermal

     974 MW

(iii)   IPPs

     4958 MW

(iv)   Rental

        62 MW

 

DATE: 15-11 -2010

 

Generation

                    10981 MW

Load Management

    962 MW

Computed Demand

                     11943 MW

KESC Export (Maximum)

         700 MW

Generation Contribution:

 

(i)     Hydel

     5230 MW

(ii)    PEPCO Thermal

     1203 MW

(iii)   IPPs

     4486 MW

(iv)   Rental

        62 MW

DATE: 14-11 -2010

 

Generation

                    11150 MW

Load Management

    915 MW

Computed Demand

                     12065 MW

KESC Export (Maximum)

         700 MW

Generation Contribution:

 

(i)     Hydel

     5243 MW

(ii)    PEPCO Thermal

     1260 MW

(iii)   IPPs

     4585 MW

(iv)   Rental

        62 MW

 

DATE: 13-11 -2010

 

Generation

                    10969 MW

Load Management

    162 MW

Computed Demand

                     11031 MW

KESC Export (Maximum)

         650 MW

Generation Contribution:

 

(i)     Hydel

     5247 MW

(ii)    PEPCO Thermal

     1098 MW

(iii)   IPPs

     4552 MW

(iv)   Rental

        62 MW

DATE: 12-11 -2010

 

Generation

                    10969 MW

Load Management

    162 MW

Computed Demand

                     11031 MW

KESC Export (Maximum)

         650 MW

Generation Contribution:

 

(i)     Hydel

     5247 MW

(ii)    PEPCO Thermal

     1098 MW

(iii)   IPPs

     4552 MW

(iv)   Rental

        62 MW

DATE: 11-11 -2010

 

Generation

                    11641 MW

Load Management

    176 MW

Computed Demand

                     11817 MW

KESC Export (Maximum)

         690 MW

Generation Contribution:

 

(i)     Hydel

     5160 MW

(ii)    PEPCO Thermal

     1280 MW

(iii)   IPPs

     5139 MW

(iv)   Rental

        62 MW

DATE: 10-11 -2010

 

Generation

                    12022 MW

Load Management

    191 MW

Computed Demand

                     12213 MW

KESC Export (Maximum)

         750 MW

Generation Contribution:

 

(i)     Hydel

     5306 MW

(ii)    PEPCO Thermal

     1218 MW

(iii)   IPPs

     5436 MW

(iv)   Rental

        62 MW

DATE: 09-11 -2010

 

Generation

                    13083 MW

Load Management

    182 MW

Computed Demand

                     13265 MW

KESC Export (Maximum)

         710 MW

Generation Contribution:

 

(i)     Hydel

     5352 MW

(ii)    PEPCO Thermal

     1552 MW

(iii)   IPPs

     5136 MW

(iv)   Rental

        62 MW

 

DATE: 08-11 -2010

 

Generation

                    12038 MW

Load Management

    194 MW

Computed Demand

                     12232 MW

KESC Export (Maximum)

         710 MW

Generation Contribution:

 

(i)     Hydel

     5268 MW

(ii)    PEPCO Thermal

     1673 MW

(iii)   IPPs

     5268 MW

(iv)   Rental

        62 MW

DATE: 07 -11 -2010

 

Generation

                    11814 MW

Load Management

    165 MW

Computed Demand

                     11999 MW

KESC Export (Maximum)

         720 MW

Generation Contribution:

 

(i)     Hydel

     5227 MW

(ii)    PEPCO Thermal

     1634 MW

(iii)   IPPs

     4891 MW

(iv)   Rental

        62 MW

DATE: 06 -11 -2010

 

Generation

                    11487 MW

Load Management

    169 MW

Computed Demand

                     11656 MW

KESC Export (Maximum)

         690 MW

Generation Contribution:

 

(i)     Hydel

     5143 MW

(ii)    PEPCO Thermal

     1481 MW

(iii)   IPPs

     4801 MW

(iv)   Rental

        62 MW

 

DATE: 04 -11 -2010

Generation

                    11541 MW

Load Management

    176 MW

Computed Demand

                     11717 MW

KESC Export (Maximum)

         710 MW

Generation Contribution:

 

(i)     Hydel

     4870 MW

(ii)    PEPCO Thermal

     1431 MW

(iii)   IPPs

     5178 MW

(iv)   Rental

        62 MW

DATE: 03 -11 -2010

Generation

                    11700 MW

Load Management

    182 MW

Computed Demand

                     11882 MW

KESC Export (Maximum)

         710 MW

Generation Contribution:

 

(i)     Hydel

     4651 MW

(ii)    PEPCO Thermal

     1446 MW

(iii)   IPPs

     5541 MW

(iv)   Rental

        62 MW

DATE: 02 -11 -2010

Generation

                    11677 MW

Load Management

    253 MW

Computed Demand

                     11930 MW

KESC Export (Maximum)

         710 MW

Generation Contribution:

 

(i)     Hydel

     4738 MW

(ii)    PEPCO Thermal

     1455 MW

(iii)   IPPs

     5422 MW

(iv)   Rental

        62 MW

DATE: 30 -11 -2010

Generation

                    11309 MW

Load Management

    246 MW

Computed Demand

                     11555 MW

KESC Export (Maximum)

         700 MW

Generation Contribution:

 

(i)     Hydel

     5379 MW

(ii)    PEPCO Thermal

     1194 MW

(iii)   IPPs

     4674 MW

(iv)   Rental

        62 MW

DATE: 30 -11 -2010

Generation

                    11253 MW

Load Management

    234 MW

Computed Demand

                     11487 MW

KESC Export (Maximum)

         720 MW

Generation Contribution:

 

(i)     Hydel

     5674 MW

(ii)    PEPCO Thermal

     1234 MW

(iii)   IPPs

     4283 MW

(iv)   Rental

        62 MW

DATE: 29 -11 -2010

 

Generation

                    10716 MW

Load Management

    221 MW

Computed Demand

                     10937 MW

KESC Export (Maximum)

         690 MW

Generation Contribution:

 

(i)     Hydel

     5157 MW

(ii)    PEPCO Thermal

     1250 MW

(iii)   IPPs

     4247 MW

(iv)   Rental

        62 MW

DATE: 28 -11 -2010

 

Generation

                    11168 MW

Load Management

    236 MW

Computed Demand

                     11404 MW

KESC Export (Maximum)

         730 MW

Generation Contribution:

 

(i)     Hydel

     5523 MW

(ii)    PEPCO Thermal

     1138 MW

(iii)   IPPs

     4445 MW

(iv)   Rental

        62 MW

DATE: 05- 11-2010

 

Generation

                    12000 MW

Load Management

    430 MW

Computed Demand

                     12430 MW

KESC Export (Maximum)

         700 MW

Generation Contribution:

 

(i)     Hydel

     5646 MW

(ii)    PEPCO Thermal

     1465 MW

(iii)   IPPs

     4827 MW

(iv)   Rental

        62 MW

 

 

DATE: 06- 11-2010

 

Generation

                    11657 MW

Load Management

    422 MW

Computed Demand

                     12079 MW

KESC Export (Maximum)

         710 MW

Generation Contribution:

 

(i)     Hydel

     5649 MW

(ii)    PEPCO Thermal

     1616 MW

(iii)   IPPs

     4330 MW

(iv)   Rental

        62 MW

 

 

 

DATE: 07- 11-2010

 

Generation

                    1270 MW

Load Management

    462 MW

Computed Demand

                     12532 MW

KESC Export (Maximum)

         700 MW

Generation Contribution:

 

(i)     Hydel

     5313 MW

(ii)    PEPCO Thermal

     1648 MW

(iii)   IPPs

     5042 MW

(iv)   Rental

        62 MW

 

DATE: 08- 11-2010

 

Generation

                    11674 MW

Load Management

    408 MW

Computed Demand

                     12082 MW

KESC Export (Maximum)

         670 MW

Generation Contribution:

 

(i)     Hydel

     5507 MW

(ii)    PEPCO Thermal

     1555 MW

(iii)   IPPs

     4550 MW

(iv)   Rental

        62 MW

 

 

 

 

DATE: 09- 11-2010

 

Generation

                    12299 MW

Load Management

    452 MW

Computed Demand

                     12751 MW

KESC Export (Maximum)

         700 MW

Generation Contribution:

 

(i)     Hydel

     5640 MW

(ii)    PEPCO Thermal

     1603 MW

(iii)   IPPs

     4994 MW

(iv)   Rental

        62 MW

 

DATE: 10- 11-2010

 

Generation

                    12299 MW

Load Management

    452 MW

Computed Demand

                     12751 MW

KESC Export (Maximum)

         700 MW

Generation Contribution:

 

(i)     Hydel

     5640 MW

(ii)    PEPCO Thermal

     1603 MW

(iii)   IPPs

     4994 MW

(iv)   Rental

        62 MW

 

 

 

 

            DATE: 11- 11-2010

 

Generation

                    11698 MW

Load Management

    425 MW

Computed Demand

                     12751 MW

KESC Export (Maximum)

         700 MW

Generation Contribution:

 

(i)     Hydel

     5274 MW

(ii)    PEPCO Thermal

     1493 MW

(iii)   IPPs

     4869 MW

(iv)   Rental

        62 MW

 

 

            DATE: 12-11-2010

 

Generation

                    11716 MW

Load Management

    431 MW

Computed Demand

                     12147 MW

KESC Export (Maximum)

         730 MW

Generation Contribution:

 

(i)     Hydel

     5503 MW

(ii)    PEPCO Thermal

     1569 MW

(iii)   IPPs

     4582 MW

(iv)   Rental

        62 MW

 

 

 

DATE: 13-11-2010

 

Generation

                    11946 MW

Load Management

    418 MW

Computed Demand

                     12364 MW

KESC Export (Maximum)

         680 MW

Generation Contribution:

 

(i)     Hydel

     5524 MW

(ii)    PEPCO Thermal

     1749 MW

(iii)   IPPs

     4611 MW

(iv)   Rental

        62 MW

 

 

DATE: 14-11-2010

 

Generation

                    11749 MW

Load Management

    406 MW

Computed Demand

                     12155 MW

KESC Export (Maximum)

         680 MW

Generation Contribution:

 

(i)     Hydel

     5307 MW

(ii)    PEPCO Thermal

     1827 MW

(iii)   IPPs

     4553 MW

(iv)   Rental

        62 MW

 

 

 

DATE: 15-11-2010

 

Generation

                    12507 MW

Load Management

    435 MW

Computed Demand

                     12942 MW

KESC Export (Maximum)

         690 MW

Generation Contribution:

 

(i)     Hydel

     5290 MW

(ii)    PEPCO Thermal

     1832 MW

(iii)   IPPs

     4323 MW

(iv)   Rental

        62 MW

 

 

 

DATE: 16-11-2010

 

Generation

11517 MW

Load Management

NIL

Computed Demand

11517 MW

KESC Export (Maximum)

720 MW

Generation Contribution:

 

(i)     Hydel

5650 MW

(ii)    PEPCO Thermal

1881 MW

(iii)   IPPs

3956 MW

(iv)   Rental

30 MW

 

 

DATE: 17-11-2010

 

Generation

11373 MW

Load Management

NIL

Computed Demand

11373 MW

KESC Export (Maximum)

710 MW

Generation Contribution:

 

(i)     Hydel

5673 MW

(ii)    PEPCO Thermal

1643 MW

(iii)   IPPs

4063 MW

(iv)   Rental

30 MW

 

 

 

DATE: 18-11-2010

 

Generation

10034 MW

Load Management

NIL

Computed Demand

10043 MW

KESC Export (Maximum)

600 MW

Generation Contribution:

 

(i)     Hydel

5485 MW

(ii)    PEPCO Thermal

1053 MW

(iii)   IPPs

3466 MW

(iv)   Rental

30 MW

 

 

DATE: 19-11-2010

 

Generation

9967 MW

Load Management

NIL

Computed Demand

9967 MW

KESC Export (Maximum)

660 MW

Generation Contribution:

 

(i)     Hydel

5662 MW

(ii)    PEPCO Thermal

837 MW

(iii)   IPPs

3438 MW

(iv)   Rental

30 MW

 

DATE: 20-11-2010

 

Generation

10183 MW

Load Management

NIL

Computed Demand

10183 MW

KESC Export (Maximum)

650 MW

Generation Contribution:

 

(i)     Hydel

5656 MW

(ii)    PEPCO Thermal

910 MW

(iii)   IPPs

3587 MW

(iv)   Rental

30 MW

 

 

 

 

DATE: 21-11-2010

 

Generation

10827 MW

Load Management

NIL

Computed Demand

10827 MW

KESC Export (Maximum)

650 MW

Generation Contribution:

 

(i)     Hydel

5536 MW

(ii)    PEPCO Thermal

1064 MW

(iii)   IPPs

4197 MW

(iv)   Rental

30 MW

 

DATE: 22-11-2010

 

Generation

10547 MW

Load Management

NIL

Computed Demand

10547 MW

KESC Export (Maximum)

690 MW

Generation Contribution:

 

(i)     Hydel

5506 MW

(ii)    PEPCO Thermal

1078 MW

(iii)   IPPs

3091 MW

(iv)   Rental

62 MW

 

 

 

 

DATE: 23-11-2010

 

Generation

10985 MW

Load Management

NIL

Computed Demand

10985 MW

KESC Export (Maximum)

700 MW

Generation Contribution:

 

(i)     Hydel

5340 MW

(ii)    PEPCO Thermal

1243 MW

(iii)   IPPs

4340 MW

(iv)   Rental

62 MW

 

DATE: 24-11-2010

 

Generation

11055 MW

Load Management

403 MW

Computed Demand

11485 MW

KESC Export (Maximum)

700 MW

Generation Contribution:

 

(i)     Hydel

5275 MW

(ii)    PEPCO Thermal

1437 MW

(iii)   IPPs

4281 MW

(iv)   Rental

62 MW

 

 

 

 

DATE: 25-11-2010

 

Generation

11284 MW

Load Management

231 MW

Computed Demand

11515 MW

KESC Export (Maximum)

750 MW

Generation Contribution:

 

(i)     Hydel

5681 MW

(ii)    PEPCO Thermal

1291 MW

(iii)   IPPs

4312 MW

(iv)   Rental

00 MW

 

 

DATE: 26-11-2010

 

Generation

11100 MW

Load Management

244 MW

Computed Demand

11344 MW

KESC Export (Maximum)

720 MW

Generation Contribution:

 

(i)     Hydel

5581 MW

(ii)    PEPCO Thermal

1247 MW

(iii)   IPPs

4272 MW

(iv)   Rental

00  MW

 

 

 

DATE: 27-11-2010

 

Generation

11105 MW

Load Management

234 MW

Computed Demand

11339 MW

KESC Export (Maximum)

700 MW

Generation Contribution:

 

(i)     Hydel

5622 MW

(ii)    PEPCO Thermal

1081 MW

(iii)   IPPs

4340 MW

(iv)   Rental

62  MW

Useful Links
 
 
  Services
WAPDA PITC
World Bank Ministry of Water & Power
Asian Development Bank NTDC
Pakistan Engineering Council Computer Society of Pakistan
 
   PEPCO Web Mail    Report Theft
   PEPCO Jobs    Consumer Complaint
   Downloads    Subscribe for our News feed
   Feedback    
 

Best viewed at resolution of 1280 x 1024 in Internet Explorer 6+
Site designed and developed by Information Technology Group,Office of Director General (I.S), PEPCO Computer Center HQ, WAPDA House, Lahore
 Copyrights 2009, Paksitan Electric Power Company, PEPCO All rights reserverd