Javascript DHTML Drop Down Menu Powered by dhtml-menu-builder.com Performance of HYDEL POWER STATIONS
[01/07/2007 - 30/06/2008]


Tarbela
Installed Capacity
3478  
MW
Effective Capacity (Max.)
3702  
MW
Effective Capacity (Min.)
1350  
MW
Energy Generationm
14959.18  
GWH
Auxiliary Consumption
69.79  
GWH
Maximum Load
3702  
MW
Plant Factor
49.1  
%
Availability Factor
94.67  
%

0  

Mangla
Installed Capacity
1000  
MW
Effective Capacity (Max.)
1150  
MW
Effective Capacity (Min.)
500  
MW
Energy Generationm
4687.333  
GWH
Auxiliary Consumption
118.887  
GWH
Maximum Load
1150  
MW
Plant Factor
53.51  
%
Availability Factor
92.54  
%

0  

Warsak
Installed Capacity
243  
MW
Effective Capacity (Max.)
231  
MW
Effective Capacity (Min.)
100  
MW
Energy Generationm
1050.042  
GWH
Auxiliary Consumption
23.71  
GWH
Maximum Load
208  
MW
Plant Factor
49.33  
%
Availability Factor
84.51  
%

0  

Chashma
Installed Capacity
184  
MW
Effective Capacity (Max.)
184  
MW
Effective Capacity (Min.)
24.8  
MW
Energy Generationm
987.494  
GWH
Auxiliary Consumption
1.32  
GWH
Maximum Load
184  
MW
Plant Factor
61.27  
%
Availability Factor
85.2  
%

0  

Dargai
Installed Capacity
20  
MW
Effective Capacity (Max.)
18.8  
MW
Effective Capacity (Min.)
2  
MW
Energy Generationm
145.571  
GWH
Auxiliary Consumption
0.358  
GWH
Maximum Load
18.8  
MW
Plant Factor
83.09  
%
Availability Factor
93.99  
%

0  

Malakand (Jabban)
Installed Capacity
0  
MW
Effective Capacity (Max.)
0  
MW
Effective Capacity (Min.)
0  
MW
Energy Generationm
0  
GWH
Auxiliary Consumption
0  
GWH
Maximum Load
0  
MW
Plant Factor
0  
%
Availability Factor
0  
%

0  

Rasul
Installed Capacity
22  
MW
Effective Capacity (Max.)
17  
MW
Effective Capacity (Min.)
1  
MW
Energy Generationm
36.566  
GWH
Auxiliary Consumption
3.351  
GWH
Maximum Load
15.6  
MW
Plant Factor
18.97  
%
Availability Factor
90.35  
%

0  

Shadiwal
Installed Capacity
13.5  
MW
Effective Capacity (Max.)
8  
MW
Effective Capacity (Min.)
1.4  
MW
Energy Generationm
43.63  
GWH
Auxiliary Consumption
1.123  
GWH
Maximum Load
8  
MW
Plant Factor
36.89  
%
Availability Factor
93.74  
%

0  

Nandipur
Installed Capacity
13.8  
MW
Effective Capacity (Max.)
8.7  
MW
Effective Capacity (Min.)
1.8  
MW
Energy Generationm
29.056  
GWH
Auxiliary Consumption
1.414  
GWH
Maximum Load
8.6  
MW
Plant Factor
24.04  
%
Availability Factor
80.44  
%

0  

Chichoki
Installed Capacity
13.2  
MW
Effective Capacity (Max.)
9  
MW
Effective Capacity (Min.)
2  
MW
Energy Generationm
19.703  
GWH
Auxiliary Consumption
2.236  
GWH
Maximum Load
7  
MW
Plant Factor
17.4  
%
Availability Factor
90.8  
%

0  

K/Garhi
Installed Capacity
4  
MW
Effective Capacity (Max.)
4  
MW
Effective Capacity (Min.)
2.6  
MW
Energy Generationm
17.859  
GWH
Auxiliary Consumption
1.346  
GWH
Maximum Load
4  
MW
Plant Factor
50.97  
%
Availability Factor
87.7  
%

0  

Renala
Installed Capacity
1.1  
MW
Effective Capacity (Max.)
1.1  
MW
Effective Capacity (Min.)
0.28  
MW
Energy Generationm
3.339  
GWH
Auxiliary Consumption
0.041  
GWH
Maximum Load
0.71  
MW
Plant Factor
34.66  
%
Availability Factor
70.98  
%

0  

Chitral
Installed Capacity
1  
MW
Effective Capacity (Max.)
1  
MW
Effective Capacity (Min.)
1  
MW
Energy Generationm
4.851  
GWH
Auxiliary Consumption
0.027  
GWH
Maximum Load
1.077  
MW
Plant Factor
55.39  
%
Availability Factor
76.89  
%

0  

Ghazi Barotha
Installed Capacity
1450  
MW
Effective Capacity (Max.)
1450  
MW
Effective Capacity (Min.)
1100  
MW
Energy Generationm
6573.701  
GWH
Auxiliary Consumption
103.545  
GWH
Maximum Load
1450  
MW
Plant Factor
51.75  
%
Availability Factor
96.46  
%

0  


Government Links
 
 
  Services
Ministry of Water and Power NEPRA
Asian Development Bank Power Save
World Bank

NTDC

WAPDA DISCO
Pakistan Engineering Council Power Save
 
   PEPCO Web Mail    Report Theft
   PEPCO Jobs    Consumer Complaint
   Downloads    Subscribe for our News feed
   Feedback    
 

Best viewed at resolution of 1280 x 1024 in Internet Explorer 6+
Site designed and developed by Information Technology Group,Office of Director General (I.S), PEPCO Computer Center HQ, WAPDA House, Lahore
 Copyrights 2009, Paksitan Electric Power Company, PEPCO All rights reserverd