Javascript DHTML Drop Down Menu Powered by dhtml-menu-builder.com Chashma Hydropower Project


Chashma Hydropower Project is located on the right abutment of Chashma Barrage. The barrage is located on the Indus River near the village Chashma in Mianwali District, about 304 k.m. North West of Lahore. The project has been estimated at Rs17, 821.77 million including foreign exchange component of Rs 9264.25 million.

The installed capacity of power Station is 184 MW comprising of 8 bulb type turbine units each of 23 MW capacity. The bulb turbines have been installed for the first time in Pakistan. The first unit was commissioned in January 2001, while final commissioning of all units was completed in July 2001.

Chashma Hydropower Project

Reservoir

Maximum pond level 649 ft.
Normal pond level 642 ft.
Minimum pond level 637 ft.

Power House

Turbine (bulb type) 1-8
Make Fuji, Japan
Output (each) 23 MW
Rotation Speed 85.7 RPM
Runner Dia 21 ft.
Discharge/unit 8829 cfs.
Head available 13 to 38 ft.
Rated Head 27.4 ft.

Generators
Make Fuji, Japan
Output 23 MW
Voltage 11KV

Transformres
Make GEC, Alsthom France
Capacity 26 MVA
Voltage 11/132 KV.

Project Benefits

The expected total energy generated annually after commissioning of all eight units, is estimated at 1081 GWH. Based on the energy generated, the estimated yearly revenue is RS2259.29 million.

Government Links
 
 
  Services
Ministry of Water and Power NEPRA
Asian Development Bank Power Save
World Bank

NTDC

WAPDA DISCO
Pakistan Engineering Council Power Save
 
   PEPCO Web Mail    Report Theft
   PEPCO Jobs    Consumer Complaint
   Downloads    Subscribe for our News feed
   Feedback    
 

Best viewed at resolution of 1280 x 1024 in Internet Explorer 6+
Site designed and developed by Information Technology Group,Office of Director General (I.S), PEPCO Computer Center HQ, WAPDA House, Lahore
 Copyrights 2009, Paksitan Electric Power Company, PEPCO All rights reserverd